Gvozd Wind Park - Investment in the energy future of Montenegro
Near the village of Gvozd, municipality of Nikšić, one of the most significant projects of renewable energy sources in Montenegro is being realized - a wind park with a capacity of 54.6 MW. The project is implemented in partnership between the Electric Power Company of Montenegro (EPCG) and the company Green Gvozd doo, with the financial support of the European Bank for Reconstruction and Development (EBRD), which approved a corporate loan in the amount of 82 million euros. The wind farm is expected to produce at least 141 GWh of clean energy per year, which directly contributes to reducing the share of thermal sources in the country's energy mix.
As part of the complex infrastructure project "Gvozd", XEnergy, in a consortium with the company Elnos Group from Belgrade as a leading partner, is responsible for the implementation of works on connecting the wind farm to the power grid, within LOT 3: Grid Connection Works.
Contracted works include:
- Construction of a new substation 33/110kV "Gvozd"
- Expansion of the existing substation 33/110kV "Krnovo"
- Expansion of the 110/35 kV "Nikšić 1" substation
- Construction of 110kV overhead line "Gvozd - Krnovo"
- Construction of the 110 kV overhead line "Gvozd - Nikšić", including the reconstruction of the line "Nikšić 1 - Bileća"
These works are performed according to the "turnkey" system, which includes all phases - from design, preparation and execution to commissioning. The project is divided into several public procurements, and the Grid Connection phase (LOT 3) represents the most important segment for the integration of produced energy into the national system.
The construction and connection of the Gvozd wind farm represents a strong step towards strengthening the energy independence of Montenegro, contributes to the achievement of climate goals and positions the country as a leader in the region when it comes to the transition to a sustainable, low-carbon future.